How Can I Build a Robust GTN System with Accuracy Checks?

July 17, 2024

Creating a reliable system with comprehensive completeness and accuracy checks in your Gross-to-Net system ensures seamless contract analysis, discount forecasting, and reserve reporting. This blog will delve into the essential steps to build such a system, highlighting the importance of subject matter expertise, realistic timelines, extensive testing phases, and clearly defined business requirements.  

  

Subject Matter Expertise: The Backbone of a Complete System  

  

To construct a robust system, it is imperative to assemble a project team that includes Subject Matter Experts (SMEs) for each functional area. These experts bring in-depth knowledge and experience crucial for identifying potential pitfalls and ensuring that all functional requirements are thoroughly addressed. Each SME understands the nuances of their specific area, ensuring that the system’s design is comprehensive but also practical and efficient. Without this specialized expertise, the project risks overlooking critical elements that could compromise the system’s completeness and accuracy.  

  

Realistic Timelines: Avoiding the Pitfalls of Rushed Results  

  

The adage “Rome wasn’t built in a day” holds particularly true in system development. Allocating a realistic timeline is not just about avoiding rushed results; it is about ensuring the project’s progress is steady and reliable. Rushing through the development process can lead to missed details, incomplete checks, and a flawed system. A well-planned timeline allows the project team to evaluate each aspect of the system thoroughly, ensuring all requirements are met, and the system functions as intended. It is about balancing efficiency with thoroughness to deliver a high-quality solution; a realistic timeline is the key to achieving this balance.  

  

Extensive SIT and UAT Phases: Leaving No Stone Unturned  

  

System Integration Testing (SIT) and User Acceptance Testing (UAT) are not just phases in the project lifecycle; they are the checkpoints that ensure the system’s functionality. During SIT, the integration of various components is rigorously tested to ensure they work together seamlessly. This phase identifies and rectifies any issues related to data flow, interface functionality, and overall system integration. On the other hand, UAT involves testing the system from the end-user’s perspective to ensure it meets all business requirements and functions as expected in real-world scenarios. These extensive testing phases are what guarantee the system’s reliability and functionality.  

  

By conducting thorough SIT and UAT phases, the project team can identify and resolve issues before the system goes live, thereby minimizing the risk of disruptions during the initial production period. Extensive testing helps ensure that all system components operate correctly and meet the required standards of completeness and accuracy.  

  

Identified Business Requirements: The Foundation of Completeness and Accuracy  

  

For a system to have practical completeness and accuracy checks, it is crucial to have a well-documented list of business requirements. These requirements act as a blueprint for the project team and SMEs, guiding the development process and ensuring all necessary checks and balances are in place. A comprehensive list of business requirements includes all the conditions the system must satisfy to be deemed complete. This list should be developed with all stakeholders to reflect the business needs and expectations accurately.  

  

Identified business requirements help create detailed test cases for the SIT and UAT phases, ensuring that every aspect of the system is validated against these requirements. This process also facilitates better communication among project team members, reducing the risk of misunderstandings and ensuring that everyone is aligned toward the common goal of building a robust and reliable system.  

  

About Breakaway GTN  

  

Breakaway’s GTN solution is designed to provide an out-of-the-box, turn-key solution for contract analysis, discount forecasting, and reserve reporting. Tailored for branded and generic pharmaceutical manufacturers, GTN automates gross-to-net processes, organizes contract data, and minimizes accrual and forecasting risks. By implementing Breakaway GTN, companies can streamline their financial operations, enhance data accuracy, and ensure compliance with industry standards.  

  

Building a Robust Gross-to-Net System  

  

Building a system with completeness and accuracy checks in your Gross-to-Net system involves a multifaceted approach that includes leveraging subject matter expertise, adhering to realistic timelines, conducting extensive testing phases, and having clearly defined business requirements. Each element ensures the system is reliable, efficient, and meets the business’s needs. By following these guidelines, companies can develop a robust system that enhances their operational efficiency and ensures the accuracy of their financial processes.  

  

Incorporating these best practices helps deliver a high-quality solution and fosters a culture of diligence and thoroughness within the project team. With the right approach, Breakaway GTN can be a powerful tool in managing gross-to-net processes, contributing to the organization’s overall success and growth.  

  